Kentower- 40th Lane
Company is mainly focusing in providing the highest level of professionalism and full architectural and engineering services keeping in mind to meet the high flying requirements of this rapidly growing sector.
A comfortable home in a peaceful milieu is a worldly dream and you may feel the difference in the finish of “Ken Tower” apartments which are unmatched in quality and worth the money spent, while enjoying the comfortable life style with enhancing tranquility.
Since the living areas of each apartment seamlessly open into a spacious terrace, it’s the ideal place to wake up and bask in the morning sunrise or enjoy the evening sunset at the end of a busy day.
Key Features
Features
Designed to ensure
– Privacy
– Easy parking & Accessibility
– Pleasing Interiors – Security
Amenities
– Intercom system
– Modern & elegant imported fittings, lighting, sanitary kitchen etc…
– Cable TV connection
– A/C for Master bed room & living room
Finishes
WALL – Emulsion paint in pleasing shades
FLOOR – Timber Flooring in living and dining rooms, non slippery tiles in bathrooms, Heavy duty ceramic tiles in common areas
WINDOW – Rust proof powder coated aluminum windows
DOORS – High quality solid timber doors and Yale lock set at entrance and rooms
PANTRY – Pantry cupboards with granite top & stainless steel sink
BATHROOM – Hot water geyser in bathrooms
Common Facilities
ELEVATOR – Two numbers high speed elevators
STANDBY GENERATOR -Backup power supply for common areas
FIRE PROTECTION SYSTEM – Fire extinguishers, wet rise system, house reels and “Exit” signs
GARBAGE COLLECTION – Storage area in ground floor with trolleys for collection and transfer to C.M.C Truck
OTHER
– Reception, Maintenance office
– 24 hours security
Special Integrates
– Swimming pool
– Gymnasium
– Centralized LP gas systems with individual meters
Floor Plan
Location
Availability
Floor | Unit A 950 Sqft | Unit B 1280 Sqft | Unit C 1320 Sqft | Unit D 930 Sqft |
---|---|---|---|---|
1st | SOLD | SOLD | SOLD | SOLD |
2nd | SOLD | SOLD | SOLD | SOLD |
3rd | SOLD | SOLD | SOLD | SOLD |
4th | SOLD | SOLD | SOLD | SOLD |
5th | SOLD | SOLD | SOLD | SOLD |
6th | SOLD | SOLD | SOLD | SOLD |
7th | SOLD | SOLD | SOLD | SOLD |
8th | SOLD | SOLD | SOLD | SOLD |
Current Status
External wall painting & bedding for tile work- 09th January 2018
Door Frame work & roof top high wall plastering- 28th November 2017
Internal and external wall plastering works- 18th September 2017
07th floor brick work and 8th floor external wall plastering – 28th August 2017
Ongoing plastering works 8th Floor – 10th August 2017
8th floor internal wall brick works and balconies plastering – 3rd August 2017
6th Floor masonry work – 7th July 2017
Seventh floor masonry work and electric work – 22nd June 2017
Structure completed. Partition completed up to 5th floor – 12th June 2017