KEN TOWER – Mary’s Road
Designed to suit the urban lifestyles of our customers, Ken Tower Mary’s Road apartments in Colombo 04 is located just a walking distance to Galle Road as well as many other modern conveniences.
Key Features
Features
Designed to ensure
– Privacy
– Easy parking & Accessibility
– Pleasing Interiors
– Security
Amenities
– ceiling fans in living,Dining and all rooms
– Air conditioning in One bedroom
– Intercom system
Finishes
WALL – Emulsion paint in pleasing shades
FLOOR – Imported tiles in living and dining rooms, non slippery tiles in bathrooms, Heavy duty ceramic tiles in the common area
WINDOW – Rust proof powder coated aluminum windows
DOORS – High quality solid timber doors and Yale lock set at entrance and rooms
PANTRY – pantry cupboards (bottom unit) with granite top & stainless steel sink
BATHROOM – Hot water geyser in Master bathroom
Common Facilities
ELEVATOR – One number high speed Elevator
STANDBY GENERATOR -Backup power supply for common area
FIRE PROTECTION SYSTEM – Fire extinguishers, wet rise system, house reels and exit signs.
GARBAGE COLLECTION – Storage area in ground floor with trolleys for collection and transfer to C.M.C Truck
OTHER
– Reception, Visitors lobby, Maintenance office
– 24 hours security
Floor Plan
Location
Availability
Floor | Unit A 1550 Sqft | Unit B 1550 Sqft |
---|---|---|
1st | SOLD | SOLD |
2nd | SOLD | SOLD |
3rd | SOLD | SOLD |
4th | SOLD | SOLD |
5th | SOLD | SOLD |
6th | SOLD | AVAILABLE |
7th | SOLD | SOLD |
8th | SOLD | SOLD |
Current Status
Rooftop waterproofing covered concreting – 23th September 2019
Rooftop city view & sea view, and staircase & common area tiling work completed. – 20th September 2019
ongoing exterior finishes – 27th June2019
Ground floor transformer room finishes – 14th June 2019
ongoing skirtin work – 9th June 2019
Rooftop views and high wall build completed – 15th May 2019
Bathroom wall & floor Tiling and fittings works completed – 05th May 2019
Common Area staircase plastering completed – 28th April 2019
Ongoing Pantry cupboard installation works – 20th April 2019
Ongoing Main door and bedroom door fixing works – 24th March 2019
Bathroom wall tile installation completed – 28th February2019
Ongoing common area tiling works – 23th February2019
Ongoing Tiling & Aluminum works – 19th January2019
Common area staircase plastering – 30th November2018
On going lift work – 27th November2018
Ongoing wiring work – 3th August 2018
Bedding for floor tile installation – 15th July 2018
ongoing 02nd floor unit-B internal house painting work & roof top slab concreting has been completed – 10th July 2018
05th floor Slab concreting – 18 April 2018
04th floor Slab concreting – 27th February 2018
03rd floor Slab concreting – 2nd Febuary 2018
2nd floor slab concreting completed – 8th January 2018
First floor Column concrete complete – 30th November 2017
01th floor slab concreting at No,16,Mary’s road,Colombo-04 – 11th November 2017
Foundation column reinforcement completed – 5th November 2017
Mezzanine floor reinforcement – 01st November 2017
Mezzanine floor form work – 30th October 2017
Ground floor Completed – 12th October 2017
Tie beam and ground floor – 23rd September 2017
Foundation Back filling – 18th September 2017
Foundation raft beam concrete completed – 29th August 2017
Concreting raft foundation – 14th August 2017
Beam reinforcement -1st August 2017
Screed concrete laying – 16th July 2017
Ongoing raft foundation concreting – 15th July 2017
Soil excavation and shoring – 13th July 2017
Soil excavation – 07th July 2017
Shoring H iron insertion started – 30th June 2017
The Foundation Stone Laying Ceremony of Ken Tower – Mary’s Road, No.16, Mary’s Road, Colombo 04.
05th December 2016